SURVEY SOLUTIONS

solution.jpg (514096 bytes)

For over 25 years we have had some involvement with survey equipment and modifications with one customer.  Twelve years ago we started getting more involved in survey equipment design, manufacture and installations on various aircraft for a number of customers.

We hold an STC for a tail boom on Cessna 185 on wheels, floats and skis.  We hold  an STC for a C206 wing pods and tail boom are in the works.  We also hold STC for helicopter nose boom.

In the fall of 2006 we completed the modification of a Lake LA4-200 with 120 AMP electrical system, survey equipment, control panel with dual voltage and a 16' survey pod to house a magnetometer sensor and lazar camera mounted on the nose of the Lake aircraft.

We are currently contracted to install nose boom and wing pods on a Twin Otter.

On July 30, 2007 we completed the first phase of mods for Alfred Wegener Institute's Polar 5, a Basler BT67 for the design, manufacture and installation of atmospheric and geophysical survey equipment.  We completed phase 2 in March and April of 2008.

 

helicopter.jpg (370766 bytes)

IMG_2018Red.jpg (1662603 bytes)

NNNtailboom.jpg (76752 bytes)

image004.jpg (40075 bytes)

C-FTPN.JPG (258875 bytes)

IMG_4883.JPG (1800319 bytes)

P2130020.JPG (1149511 bytes)

twin otter dhc-6 with nose boom and tip pods feb 11 08 isos.JPG (1083325 bytes)

twin otter dhc-6 with nose boom and tip pods isoview.JPG (922060 bytes)

Twin Otter DHC-6 with Nose Boom and tip pods.jpg (1768161 bytes)

30.jpg (1042330 bytes)

28a.JPG (282504 bytes)

fall 07 149.jpg (1777216 bytes)

fall 07 007.jpg (1094035 bytes)